Case Studies

blackburn acute medical unit

New NHS bed lift for the Royal Blackburn Teaching Hospital

The Royal Blackburn Teaching Hospital’s Acute Medical Unit (AMU) is one of the North West’s busiest Accident and Emergency Departments. As such, the hospital requires all of its equipment to be reliable and operational at all times. Earlier this year Sheridan Lifts were awarded the contract to install a brand new MRL passenger/bed lift. This…

new motor

Oxford House, Liverpool

Work is well underway on a lift modernisation at Oxford House in Liverpool. These works will include new entrances being created and existing entrances formed. This is a full turn-key package with our industry partners, International Lift Equipment and for the major builders works, PRNS Building Services Ltd. The left-hand lift (whilst looking into the…

traction sheave

Kellogg’s GB

Traction sheave replacement in Manchester

We are currently working with our long standing, highly valued client Kellogg’s GB at their factory site in Greater Manchester. Throughout the ongoing coronavirus pandemic the site at Kellogg’s GB has remained fully open and functional albeit it with strict admittance / access procedures in place. As you’ll know, Kellogg’s are the multi-national food production…

lift shaft

Case Study: An electrical lift refurbishment by Sheridan Lifts

We are commencing our second week of work on a 12-story building for one of our clients. This week we are continuing to carry out a full MRL electrical refurbishment (no motor room) after some severe historic water damage to the existing equipment was causing ongoing issues for the tenants of this residential block. We…

the lalit london

In Profile: The Lalit London

Top luxury hotel comes on board for lift maintenance

We are delighted to report a superb new addition to our lift maintenance portfolio. The Lalit London on Tooley Street has come on board with Sheridan Lifts following a successful tender process. Located on the banks of the River Thames, this sophisticated hotel oozes charm and glamour. It's very much somewhere to bring your other…

new motor with new sheaves

Sheridan Lifts to the rescue over the Christmas period

Reactive lift maintenance for Shop Direct Ltd

The festive period is always a busy time for our engineers. Whilst our head office itself may be closed, many of the businesses we look after are 100% reliant on their lifts for business-critical production purposes. As such, we can never rest on our laurels and our engineers are on call up and down the…

Lift maintenance contract for West London Audi

A nice little Christmas boost for Sheridan’s

We have a prestigious new lift maintenance contract in the bag for our new client West London Audi. The contract will see Sheridan Lifts maintaining 6 escalators and 2 lifts within this large, impressive facility located in Brentford. West London Audi is the World’s largest Audi centre having opened in October 2009 and is located…

Case Study for our client ISG

Requiring the use of vertical transportation within a specialist health laboratory

Today I have a bit of a treat for you as I elaborate further on this multi lift project we carried out in Fitzrovia, London for our client ISG. We were involved with this project from the very beginning, working alongside the architects and the end user. Manufactured in Germany, the lifts went through many…

A discussion about our work with Grade II Listed buildings

And a sit down with Mas’ud Mallick and Nick Beetson

It struck me this week that we do quite a lot of work within Grade II Listed Heritage buildings, and I was curious to discover how working within the confines of these buildings might differ from our regular projects. Two such recent projects are at the Redfern Building in Manchester and at 55 Faulkner Street…

Anthony B gets his career up and running with Sheridan Lifts

Three years ago, Anthony was working as a self-employed electrician when his father took unwell. Suffering with anxiety and depression, Anthony decided to put his career on hold to look after his dad. After several heart attacks and approximately 3 years of care, Anthony found himself in a situation where he needed to get back…